Bridge Lifts were called to deliver another fantastic lift installation, this time for a student accommodation property at the Student Beehive in Loughborough. The lift was requested by a local building firm who needed to provide a lift replacement to the old lifts currently in use as they needed an extra floor including for the property extension.
The 3-floor hydraulic lift built and provided by our Spanish manufacturers which holds a capacity of 630kg, was installed within the old lift shaft. Of course, with every installation, especially when replacing an existing lift, we had some teething issues, all of which were ironed out and solutions found by our team of engineers to make the project a breeze.